Projects

Our company is well equipped with a team of dedicated and experienced engineers who specialise in Design, Maintenance, Installation, Modification and Facility Upgrading. With modern and innovative techniques and state-of-the-art equipment at our disposal, our Engineering and Technical Team is committed to delivering high quality, efficient and cost-effective engineering solutions to provide our customers maximum satisfaction.

Upgrading of Fenders and Bollards

This Project was carried out at Leam Chabang Port, south of Bangkok, Thailand. Our technical team of experienced engineers executed the operation within one month from May to June 2021. Within one month, we managed to remove and reinstall fenders and bollards covering a harbour length of 500m. This project was carried out in anticipation of the berthing of the CMA CGM Marco Polo, which was a massive ship that required refurbished infrastructure for its berthing. Our team managed to successfully complete the upgrading job within the given time frame while accommodating to the tight berthing schedule of the wharf. Our team not only delivered high quality upgrading and swift execution but also met the safety requirements throughout the process of the project.

Modification of Gantry Rail Span

We incorporated our experience in structural engineer design for the modification of the gantry rail span from 22m to 16m according to international standard. Our engineering and technical team not only delivered high quality modifications but also met the safety requirements throughout the process of the project.

Preparation for crane mobilisation

Roll-on for 2 units 800 tons QC. All lashing works were according to international standard and complied with the safety requirements. The lashing designs were drawn by our experienced in-house design team. For this project, QC were prepared for Mobilisation and Boom structures were removed to enable bridge crossing along Shanghai Huangpu river.

Lashing of RTG cranes

Roll-on for 120 tons RTG. All lashing works are according to international standard and complied with all the safety requirements. The lashing designs were drawn by our experienced in-house design team. For this project, RTGs were prepared for Mobilisation before inspections and approvals by third parties and insurance companies.

Supply and delivery of cable reel systems

At N-nergy, we also provided services such as supplying and delivering cable reel systems for 21 units of E-RTG cranes’ conversion.