我们公司配备了一支敬业、经验丰富的工程师团队,专门从事设计、维护、安装、改造和设施升级。我们的工程和技术团队拥有现代化的创新技术和最先进的设备,致力于提供高质量、高效和具有成本效益的工程解决方案,为我们的客户提供最大的满意度。
Upgrading of Fenders and Bollards
This Project was carried out at Leam Chabang Port, south of Bangkok, Thailand. Our technical team of experienced engineers executed the operation within one month from May to June 2021. Within one month, we managed to remove and reinstall fenders and bollards covering a harbour length of 500m. This project was carried out in anticipation of the berthing of the CMA CGM Marco Polo, which was a massive ship that required refurbished infrastructure for its berthing. Our team managed to successfully complete the upgrading job within the given time frame while accommodating to the tight berthing schedule of the wharf. Our team not only delivered high quality upgrading and swift execution but also met the safety requirements throughout the process of the project.
龙门轨道跨度的改造


我们经验丰富的结构工程师按照国际标准对龙门轨道跨度从22米改造为16米进行了设计。工程和技术团队不仅交付了高质量的改造工程,而且满足了安全要求。
起重机调动的准备工作


2台800吨起重机.所有捆扎工程均符合国际标准与安全要求。捆扎设计是由公司内部设计团队完成。为拆除臂架结构做好了品管圈准备,使上海黄浦江大桥能够通过。
RTG起重机的绑扎


120吨RTG的滚装。所有的绑扎工程都符合国际标准,并满足所有的安全要求。绑扎设计由我们的内部设计团队完成。 在第三方和保险公司的检查和批准下,RTG已经做好了动员的准备。
电缆卷筒系统的供应和交付
亿能资为21台E-RTG起重机的改装提供了电缆卷筒系统的供应和交付等服务。